energy saving device in refrigeration cycle

FAQ

Where is Miracle Coil installed?
It is a liquid piping part between the outdoor unit and the indoor unit.
How much is the cost of Miracle Coil?
It depends on individual estimate.
How long is the construction period?
It will be about 20 days to 1 month from request to construction completion. Approximately 4 hours is required for the installation work of one 10 horsepower (7.5 kW) machine.
Work process: operation stop of the target machine => recovery of refrigerant => addition of Miracle Coil ⇒ refilling of refrigerant ⇒ restart
This is an approximate time and will change depending on the environment (such as ambient temperature). All the construction period of the site will vary depending on compressor output, number of units, and installation situation.
Can we do regular work in construction period?
As we make work processes that considers your business and safety
first, it will not hinder your work. Please do not worry.

If you are troubled with power saving measures, please do not hesitate to contact us TEL 81-495-71-7203 9:00 - 17:00(except Saturday, Sunday and holidays)

  • Facebook
  • Hatena
  • twitter
  • Google+
July 2018
S M T W T F S
     
1234567
891011121314
15161718192021
22232425262728
293031  
PAGETOP
Copyright © ETE Ltd. All Rights Reserved.
Powered by WordPress & BizVektor Theme by Vektor,Inc. technology.