- Where is Miracle Coil installed?
- It is a liquid piping part between the outdoor unit and the indoor unit.
- How much is the cost of Miracle Coil?
- It depends on individual estimate.
- How long is the construction period?
- It will be about 20 days to 1 month from request to construction completion. Approximately 4 hours is required for the installation work of one 10 horsepower (7.5 kW) machine.
Work process: operation stop of the target machine => recovery of refrigerant => addition of Miracle Coil ⇒ refilling of refrigerant ⇒ restart
This is an approximate time and will change depending on the environment (such as ambient temperature). All the construction period of the site will vary depending on compressor output, number of units, and installation situation.
- Can we do regular work in construction period?
- As we make work processes that considers your business and safety
first, it will not hinder your work. Please do not worry.